10
Post-installation Checklist
Upon completing installation, check and mark off the following items.
I hereby certify that installation has been completed.
Signature of installer
Checklist
Checked
Appearance
- Does the appliance not look like it is tilted to the front,
back, left or right?
- Is the frame not lifted up?
- Is the top plate clean?
Electrical
work
- Is the power supply a single phase, 240 V?
- Has the ground been installed?
- Has the earth leakage circuit breaker been installed?
Electrical
testing
1. Touch
to turn on the main power.
- Does the main power light light up?
2. Touch the following keys to check function of each
IH heater:
- Left front heater
- Left rear heater
- Right front heater
- Right rear heater
- Make sure to turn off each IH heater and the main power switch after performing
electrical testing.
- Hand the Operating Instructions, Installation Instructions, and Warranty Certificate to
the customer.
Does "7" (heat
level display)
flash?
Panasonic Canada Inc.
5770 Ambler Drive, Mississauga, Ontario, L4W 2T3
www.panasonic.ca
© Panasonic Corporation 2011
Printed in Japan