14.2.1. Component View
Note:
(H) - (O) is refered to
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
()
14.2.2. Flow Solder Side View
Note:
(A) - (P) is refered to
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
()
14.3. Adjustment (Charger Unit)
Items
Adjustment
Point
Procedure
Check
Replace
Parts
(A)
Charging Check
-
1. Connect Charge Contact 12
/2W register between and charge-.
2. Measure and confirm voltage across the regigster is 2.7V ± 0.2V.
D1,R1,R2
Note:
After the measuring, sock up the solder of TP.
The connection of adjustment equipment are as shown in
Adjustment Standard (Charger Unit)
().
14.4. Adjustment Standard (Charger Unit)
When connecting the Simulator Equipments for checking, please refer to below.
14.4.1. Flow Solder Side View
Note:
(A) is refered to
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
()
15. ADJUSTMENTS (HANDSET)
If your unit have below symptoms, adjust or confirm each item using remedy column from the
table.
46
www.freeservicemanuals.info
1/2/2015
Digitized in Heiloo, Holland