![Panasonic FV-10VEC2R Installation And Operating Instructions Manual Download Page 9](http://html1.mh-extra.com/html/panasonic/fv-10vec2r/fv-10vec2r_installation-and-operating-instructions-manual_3937764009.webp)
5.Install plug covers into plugs on frame
cover. (Fig.6)
2-long screws
(ST4.2x20)
4.Mount L plate on to stud with long screws
(ST4.2X20). (Fig.5)
3.Hang ERV on to wall bracket.
Make sure the power cord is upward.
(Fig.4)
Fig.5
Unit: inches (mm)
24 (609.6)
16 (406.4)
19 (482.6)
9
4-plug covers
Fig.6
Fig.4
1.Install ducts according to one of three methods as shown below.
Method - Simplified ducted installation (Return method)
Note
DUCTWORK
This method draws return air from the return air duct
of the air furnace and supplies an equal amount of
outside air farther downstream into the return duct.
(Fig.7 & Fig.8)
(1)The ERV unit must be balanced.
(2)It is mandatory that HVAC/AHU signal cord be
connected.
(3)Check local codes and authority having
jurisdiction for acceptance.
Fig.7
CAUTION
Power cord
Wall bracket
INSTALLATION (WALL MOUNT)