![Panasonic FV-08VQL3 Installation Instructions Manual Download Page 6](http://html2.mh-extra.com/html/panasonic/fv-08vql3/fv-08vql3_installation-instructions-manual_3830935006.webp)
6
Installation (Joist mounting installaton) continued
I
Slide 4" dia. duct onto adapter and secure with tape.
Remove ceiling section.
(Fig.4)
5.
When connecting the light unit and the fan unit to the
different power sources, connect the conduit to their
respective junction box shown in Fig. 3 on page 5 and
connect the wires according to the wiring diagram.
NOTE
Fig. 4
Wiring Diagram
6.
Night Lamp
Fan unit
Red
Black
Motor
Capacitor
Black
White
Green
Green
Ballast
Light unit
Lamp
Lamp
Power supply
AC 120V 60 Hz
Earth ground
Junction box
Ballast
WARNING:
Make all electrical connections in accordance
with the National Electric Code (NEC) and all
local electrical codes.
CAUTION:
Mount junction box cover carefully so that lead wires
are not caught.
Ceiling joist
mm (inches)
235
235
Adapter
Ceiling
(9.25)
(9.25)
Tape
Duct
Adapter
Two 2-pin sockets (white and black) is used in the
light unit.
A 3 pin socket (white,black and green) is used in
the fan unit.
Connect the earth grounding wires (green) first.
Black
White
Power Supply
AC120V 60Hz