13-2
13.1
63B
Dwell Time
The time taken until the next operation after the completion of an executed positioning table in the
automatic operation is called dwell time.
The operations of the dwell time vary according to control methods slightly. Followings are the
operations in each control method.
For E point control
The dwell time is the time taken from the completion of the position command until the operation done
flag turns on.
For P point control
In the P point control, the positioning table operates consecutively, therefore, the dwell time is ignored.
For the last table (E point), as well as the E point control, the dwell time is the time taken from the
completion of the position command until the operation done flag turns on.
For C point control
The dwell time is the waiting time for executing the next table from the completion of the positioning table
(deceleration stop).
For the last table (E point), as well as the E point control, the dwell time is the time taken from the
completion of the position command until the operation done flag turns on.
Summary of Contents for FP2 Positioning Unit RTEX
Page 1: ......
Page 6: ...iv ...
Page 14: ...xii ...
Page 15: ...Chapter 1 Functions of Unit and Restrictions on Combination ...
Page 21: ...Chapter 2 Parts and Functions ...
Page 22: ...2 2 2 1 Parts and Functions FPΣ Positioning Unit RTEX FP2 Positioning Unit RTEX ...
Page 24: ...2 4 ...
Page 25: ...Chapter 3 Wiring ...
Page 31: ...Chapter 4 Power On Off and Items to Check ...
Page 36: ...4 6 ...
Page 37: ...Chapter 5 4BPreparation For Operation ...
Page 45: ...Chapter 6 5BI O Allocation ...
Page 53: ...Chapter 7 6BSetting Tool Configurator PM ...
Page 83: ...7 31 Setting Font Select Option Font in the menu bar The following dialog is shown ...
Page 102: ...7 50 ...
Page 103: ...Chapter 8 7BAutomatic Operation Position Control ...
Page 118: ...8 16 ...
Page 119: ...8 17 When the X axis and Y axis is the moving axes each axis in the above diagram is replaced ...
Page 141: ...Chapter 9 8BManual Operation JOG Operation ...
Page 146: ...9 6 ...
Page 147: ...Chapter 10 9BManual Operation Home Return ...
Page 155: ...Chapter 11 10BManual Operation Pulser Operation ...
Page 159: ...Chapter 12 11BStop Functions ...
Page 162: ...12 4 ...
Page 163: ...Chapter 13 12BSupplementary Functions ...
Page 177: ...13 15 Sample program When reading AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Page 179: ...13 17 Sample program When writing AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Page 183: ...Chapter 14 Precautions During Programming ...
Page 187: ...Chapter 15 Errors and Warnings ...
Page 212: ...15 26 ...
Page 213: ...Chapter 16 Troubleshooting ...
Page 214: ...16 2 16 1 Cannot Communication With AMP ...
Page 215: ...Chapter 17 Specifications ...
Page 275: ...Chapter 18 Dimensions ...
Page 276: ...18 2 18 1 FPSigma Positioning Unit RTEX ...
Page 277: ...18 3 18 2 FP2 Positioning Unit RTEX ...
Page 278: ...18 4 ...
Page 279: ...Chapter 19 Sample Programs ...
Page 283: ...19 5 ...
Page 286: ...19 8 ...
Page 288: ......