fuse and disconnect mains power via the isolate switch.
7. Terminate the COM loop and any field wiring into the connectors and plug into the
main board.
8. Turn ON the mains power and re-place the in-line fuse to connect the batteries, a
restart will now take place (see chapter "Restart", page 107 ).
9. The Site Specific Data (SSD) – created in EBLWin can now be downloaded, see
chapter "Software Installation and SSD Download", page 91.
Important note:
In retrofit applications where main board 5010 and MMI board 5011 are used, the SSD
must be imported when the 5012 and 5015 are required to replace 5010 and 5011.
See also chapter "Calibration of supervised outputs (H5/A1)", page 136.
Note:
A “Safe shutdown” must be performed once FT1020G3 is cleared of all faults and
the system becomes in normal operational mode. This is to avoid re-calibrating the
supervised outputs should the panel is turned off.
18.3
Control Units in a TLON Network
The FT1020G3 system can be built as a single TLON Network or as a redundant TLON
Network, i.e. 2 networks (dual path).
In the
single TLON Network
, one TLON connection board (5090) has to be plugged in
each Control Unit (Network no. 0) whereas in the
redundant TLON Network
, two
connection boards (5090) have to be plugged in each Control Unit.
Note:
Single TLON network is used only when additional main board is to be fitted inside
the same enclosure otherwise a redundant TLON network is used i.e. two TLON boards
5090 must be used in each control panel. A single TLON Network is a violation to the
Australian standard AS1670.1.
If 2 x 5012 boards installed in the same cabinet but connected to other remote FT1020G in a
TLON network, the second TLON must be added.
The redundant TLON Network supports full functionality in case of a network path failure,
i.e. open circuit or short circuit in one of the TLON networks.
When the 5090 boards are plugged-in and the network cables are connected
for each
Control Unit
, the same procedures as for a single Control Unit must be followed, see steps
1-9 above.
When all Control Units are powered, the TLON network installation (see below) must be
performed
before
the Site Specific Data (SSD) can be downloaded, see chapter "Software
Installation and SSD Download”, page 91.
18.3.1
Network No. 0
1. Mount the TLON connection board on the main board.
2. Connect the network cables on the main board, terminal block "J4".
3. For each control unit, repeat procedures 1-9 in section 18.2 “Single Control Unit”.
4. When all control units are powered, perform the TLON Network programming in
TLON Manager. Include only the control units that shall be connected now.
5. Install the TLON Network.
6. Download the SSD.
If you know that one or more of the Control Units might be added at a later date, follow the
procedures below:
•
In TLON Manager, perform the TLON Network programming for the project, i.e.
only the Control Units that will be connected now.
34
The TLON connection board is mounted on the main board. Network cable connections are made on the main
board, terminal block "J4".
Summary of Contents for Firetracker FT1020G3 CIE
Page 1: ...Operation Manual FT1020G3 Rev 2 10 4 For Software V2 10 4 FT1020G3 FDCIE MA430 March 2023...
Page 2: ...This page has deliberately been left blank...
Page 176: ...176 Operation Manual FT1020G3 Rev 2 10 4 Figure 24 FT1020G3 Standard Block Wiring Diagram...
Page 177: ...177 Operation Manual FT1020G3 Rev 2 10 4 Figure 25 FT1020G3 New 5012 PCB Layout...