Ref. No. 3D
Procedure 3A
→
→
→
→
3B
→
→
→
→
3C
→
→
→
→
3D
Assembly of the off lock lever.
1. Put the off lock lever into the housing boss.
2. Insert the one side of lever spring into the groove of the off lock
lever. And Hitch the other side of lever spring on the housing rib.
3. Greasing (Shell Alvania) on top of pin and insert it into housing
boss.
Ref. No. 3E
Procedure 3A
→
→
→
→
3B
→
→
→
→
3C
→
→
→
→
3D
→
→
→
→
3E
Assembly of the housing.
1. Tighten the 7 frearson housing screws and 1 (+) head screw.
NOTE:
Before closing the housing A and B, make sure that the O-ring is
set properly.
Make sure if battery terminals are set on housings.
9
EY3551-X8 / EY3552-X8
Summary of Contents for EY3551 - 18V WOOD SAW
Page 2: ... EY3551 EY3552 1 SCHEMATIC DIAGRAM 2 WIRING CONNECTION DIAGRAM 2 EY3551 X8 EY3552 X8 ...
Page 12: ...5 TROUBLESHOOTING GUIDE Refer to WIRING CONNECTION DIAGRAM 12 EY3551 X8 EY3552 X8 ...
Page 13: ...13 EY3551 X8 EY3552 X8 ...
Page 14: ...6 EXPLODED VIEW REPLACEMENT PARTS LIST 6 1 EXPLODED VIEW for EY3551 14 EY3551 X8 EY3552 X8 ...
Page 16: ...6 3 EXPLODED VIEW for EY3552 16 EY3551 X8 EY3552 X8 ...