6 - ENGLISH
Installation
After checking the height, width, and structure of the installation location, determine the appropriate positions for
setting up the screen and installing the projector.
Setting up the screen
Set up the screen according to the specified method in a position which takes into account the projection distance
and angle and the type of screen being used.
Screws tightening torques
M6
.........
4±0.5 N•m
M8
.........
10±1 N•m
M10
.......
20±1 N•m
z
Use a torque screwdriver or torque wrench to tighten screws and bolts to their specified tightening torques. Do
not use electric screwdrivers or impact screwdrivers.
Installing the attachment plate to the ceiling
After checking the height, width, and structure of the installation location, determine the appropriate positions for
setting up the screen and installing the projector.
■
Attachment plate mounting hole sizes and preparation
Make mounting holes while referring to the attachment plate diagram.
18(5/8")
22.5(7/8")
Four holes drilled to fit ceiling
mount bolts (M10)
Attachment plate diagram
Bolt mounting hole size
Install the attachment base
plate with the "FRONT"
inscription facing the screen.
Center of
screen
To the
screen
<Units: mm (")>
254 (10"
)
218 (8-9/16"
)
218 (8-9/16"
)
215 (8-7/16")
215 (8-7/16")
260 (10-1/4")
Attention
z
If attaching to a concrete ceiling, the sizes of the holes for the anchoring nuts or curled plugs should match the
sizes specified by the manufacturer.
z
Use commercially available M10 ceiling mount bolts, hex nuts, flat washers, spring washers, and anchoring
nuts or curled plugs.