Manual FRAME-EVO-P14 / P14-US
02.01.2020
Page 32 of 38
12. System maintenance and inspection (Re-examination)
The FRAME-EVO-P14 / P14-US does not require special maintenance but a visual inspection
must be done
prior to every installation
in which the system is involved:
Before and after each installation, the M6 and M8 mounting holes must be carefully
inspected, as they may get damaged during the installation of the hanging accessory.
Please carefully examine the M6 and M8 mounting holes by looking inside each one
of them and make sure the thread is not broken or damaged in any way.
Please make a visual inspection to be sure that all the screws are in the right place
and none are missing.
Make sure that the screws, nuts, stacking pins, connection rods, mounting plate and
all the components are not bended, damaged, or broken.
If any parts are broken or missing, please contact the seller so he can provide the
spare parts.