7.4. Loading section
1. Spread the tabs at the both sides and push out the drive
arm shaft.
2. Hook the lock lever spring on the lock lever projection part
temporarily.
3. Unlock the tab and remove the lock lever.
4. Remove the belt.
5. Unlock the tab and remove the pulley.
6. Remove the relay gear.
7. Turn the change lever in the arrow direction till it stops.
8. Hook the change lever spring on the change lever project
part temporarily.
13
DVD-S29EG / DVD-S29E / DVD-S29EB
Summary of Contents for DVD-S29EG
Page 18: ...18 DVD S29EG DVD S29E DVD S29EB ...
Page 23: ...23 DVD S29EG DVD S29E DVD S29EB ...
Page 34: ...34 DVD S29EG DVD S29E DVD S29EB ...
Page 54: ...17 2 MECHANISM SECTION EXPLODED VIEW 54 DVD S29EG DVD S29E DVD S29EB ...
Page 55: ...17 3 PACKING ACCESSORIES SECTION EXPLODED VIEW 55 DVD S29EG DVD S29E DVD S29EB ...