
33
NOTE:
In this action, finger stab needs to be put on.
Do not touch any parts other than the positions
marked in the Figure.
9.3.2.
Assembly
1. Insert the shaft into the shaft hole of the base, install the
OPU to the auxiliary shaft, and then attach the nut piece
unit onto the screw stem.
2. Assembly of spring.
a. Insert the two springs to the ends of the shaft.
b. Then insert the handle (B) of the spring into the spring
holder(as shown in Fig).
c. Press down the handle (A) of the spring (as shown in
Fig) into the hole.
3. Insert FFC, and desolder the solder spot.
a. Use the iron head with an angle as shown in Fig,
remove the solder in the direction as shown.
b. Set the temperature of iron below 350
°
C.
c. When using the iron head,do not apply a force more
than 1N to the pad. Do not touch any other compo-
nents around the welding spot.
Summary of Contents for DMP-BD75GA
Page 2: ...2 ...
Page 7: ...7 2 2 Precaution of Laser Diode ...
Page 9: ...9 3 Service Navigation 3 1 Service Information ...
Page 14: ...14 5 Location of Controls and Components ...
Page 35: ...35 9 3 3 How to Clean the Lens of Optical Pick UP ...
Page 39: ...39 10 1 2 Checking and Repairing of Digital P C B Module ...
Page 58: ...58 16 Schematic Diagram for printing with A4 size ...