22
Connecting The Piping To Outdoor Unit
Decide piping length and then cut by using pipe cutter. Remove
burrs from cut edge. Make flare after inserting the flare nut
(locate at valve) onto the copper pipe. Align center of piping to
valves and then tighten with torque wrench to the specified
torque as stated in the table.
CUTTING AND FLARING THE PIPING
1. Please cut using pipe cutter and then remove the burrs.
2. Remove the burrs by using reamer. If burrs is not
removed, gas leakage may be caused. Turn the piping
end down to avoid the metal powder entering the pipe.
3. Please make flare after inserting the flare nut onto the
copper pipes.
11.3.3.
Air Purging Of The Pipings And Indoor Unit
The remaining air in the Refrigeration cycle which contains moisture may cause malfunction on the compressor.
1. Remove the caps from the 2-way and 3-way valves.
2. Remove the service-port cap from the 3-way valves.
3. To open the valve, turn the valve stem of 2-way valve counter-clockwise approx. 90
°
and hold it there for ten seconds, then
close it.
4. Check gas-leakage of the connecting portion of the pipings.
* For the left pipings, refer to item 4(A).
Model
Piping size (Torque)
Gas
Liquid
C12GK
1/2” [55 N•m]
1/4” [18 N•m]
Summary of Contents for CS-C12GKF
Page 9: ...9 5 Dimensions 5 1 Indoor Unit Remote Control 5 1 1 CS C12GK ...
Page 10: ...10 5 2 Outdoor Unit 5 2 1 CU C12GK ...
Page 11: ...11 6 Refrigeration Cycle Diagram ...
Page 12: ...12 7 Block Diagram ...
Page 14: ...14 9 Electronic Circuit Diagram ...
Page 15: ...15 10 Printed Circuit Board 10 1 Indoor Unit TOP VIEW ...
Page 16: ...16 BOTTOM VIEW ...
Page 17: ...17 10 2 Indicator TOP VIEW BOTTOM VIEW ...
Page 46: ...46 ...
Page 47: ...47 15 2 Indoor Fan Motor and Cross Flow Fan Removal Procedures ...
Page 48: ...48 ...
Page 49: ...49 16 Technical Data 16 1 Thermostat Characteristics Cooling Soft Dry ...
Page 50: ...50 16 2 Operation Characteristics 16 2 1 CS C12GK CU C12GK ...
Page 51: ...51 ...
Page 53: ...53 ...