72
Line Hold Sheet
After the module is tested, the following work is executed.
The point part of the cable is fixed.
However do not paste the tape on the connector.
SCREW
(DFHE5025XA)
SCREW
(DFHE5025XA)
A
B
LCD Unit
(A) The fingernail in the point part is inserted.
(B) This side is lowered and then engages.
SIMM cover is opened.
Antenna Cover
Screw(DXHM0057ZA) are tightened. (Reuse)
LCD Front
Be parallel after putting.
LCD Rubber
Width : large
Width : small
Screws (DXHM0039ZA) are tightened.
LCD Rubbers (DXHM0039ZA) are pasted.
9.3.6.16. Putting Tapes for WWAN Antenna Cable
9.3.6.17. Assembly of the LCD Rear
Summary of Contents for CF-T5LWETZ1
Page 2: ...2 ...
Page 3: ...3 ...
Page 4: ...4 ...
Page 6: ......
Page 7: ......
Page 10: ...10 3 Block Diagram ...
Page 11: ...11 4 Diagnosis Procedure 4 1 Basic Procedures ...