4 – 30
Aquarea air/water heat pump – Installation manual for monobloc and split systems C, D and E series 05 / 2014
Location | Installing and fastening the devices
Wall penetration for split systems
1
Mounting plate 2
2
Screws
➤
Also secure the hydro module to mounting plate 2 via three Phillips
head screws .
1
2
➤
Drill a 70 mm-diameter hole through the wall at a suitable place . The
penetration must be made with an upward slope of 5 to 7 mm towards
the inside, as shown in the figure .
➤
Optionally you can insert a suitable wall gland or DN 70 bushing (to be
provided by the customer) into the wall penetration . If necessary, cut
the bushing so that it protrudes roughly 15 mm on the outside .
➤
After laying all lines, seal the outside with suitable sealant
(to be provided by the customer) .
Warning!
In cavity walls, use a wall gland to prevent rodents biting the pipes .
4.3 Wall penetration for split systems
2
1
6
3
4
5
5
15
mm
ca. 5
–
7
mm
1
Inside
2
Wall
3
Outside
4
Bushing for pipe gland
5
Sealant
6
Pipe gland
Ø
70 mm