KW1M Eco
-
POWER METER
26
Single-phase three-wire / Three-phase three-wire system
*
Two current transformers are required.
◆
When measuring a load with exceed input voltage
VT (Voltage transformer) is needed when you measure a load with over rated input voltage (220V).
Use commercial VT, those secondary rating is 110V.
Grounding the secondary side of VT (Voltage transformer) and CT (Current transformer) is not
necessary with low-voltage circuit.
Single-phase two-wire system
Single-phase, three-wire system
Three-phase, three-wire system
Summary of Contents for AKW1110
Page 1: ......
Page 56: ...KW1M Eco POWER METER 48 For 100A AKW4802C For 250A AKW4803C ...
Page 60: ......