WING PARKING:
Step 1:
Dig two (2) holes according to the specified measurements and make sure the bottom
is well tightened.
Plan ahead according to the placement of the parking as shown in the drawing.
Make sure the pits’ walls are at a 90°.
If the ground is sandy and digging proper holes is impossible, please consult a local
expert / constructor.
Step 2:
Please use wooden beams (not supplied) to set and hold the aluminum poles in place, make
sure the profiles are set at a depth of 19.6” (50 cm) in accordance with
step #4
in the
Arizona
Wave/Breeze
assembly instructions. The aluminum poles must be leveled in all directions.
* Carry out
steps 1-4
in the
Arizona Wave / Breeze
assembly instructions, prior to carrying
out this step.
Step 3:
Please note and make sure the concrete casting reaches the line that was marked on the
profile at the previous steps.
* Please wait for the concrete to be fully set and dry, in accordance with the manufacturer’s
instructions and depending on the weather conditions, before continuing with the assembly!
Step 4:
Carry out
steps 7-8
in the
Arizona Wave / Breeze
assembly instructions, prior to carrying
out this step. Please note the profile’s direction.
Step 5:
Carry out
steps 10-17
in the
Arizona Wave / Breeze
assembly instructions, prior to
carrying out this step.
Step 6:
Carry out steps 18-19 in the
Arizona Wave / Breeze
assembly instructions, prior to
carrying out this step.
Step 7:
Carry out
steps 20-32
in the
Arizona Wave / Breeze
assembly instructions, prior to
carrying out this step.
For
Arizona Breeze - WINGS
: After this step, proceed with Arizona Breeze assembly
instructions.
Step 8:
Carry out
steps 20-25
in the
Arizona Wave
assembly instructions, prior to carrying out this step.
Step 9:
Carry out
steps 27-29
in the
Arizona Wave
assembly instructions, prior to carrying out this step.
Step 10:
Lay out all the panels and make sure they overlap, move one set of panels at a time in
order to connect them to the roof with the supplied screws. After this step, proceed
with
Arizona Wave
assembly instructions.
ARCH PARKING:
Step 11:
Dig (4) holes according to the specified measurements and make sure the bottom is
well tightened.
Plan ahead according to the placement of the parking as shown in the drawing.
Make sure the pits’ walls are at a 90°.
If the ground is sandy and digging proper holes is impossible, please consult a local
expert / constructor.
Step 12:
Please use wooden beams (not supplied) to set and hold the aluminum poles in place, make
sure the profiles are set at a depth of
19.6” (50 cm)
in accordance with
step #4
in the Arizona
Wave/Breeze assembly instructions.
The aluminum poles must be leveled in all directions.
Step 14:
lease note and make sure the concrete casting reaches the line that was marked
on the profile at the previous steps.
* Please wait for the concrete to be fully set and dry, in accordance with the manufacturer’s
instructions and depending on the weather conditions, before continuing with the assembly!
Step 15:
Carry out
steps 7-25
in the
Arizona Breeze
assembly instructions, prior to carrying
out this step.
Step 17:
Carry out
step 32
in the
Arizona Breeze
assembly instructions, prior to carrying out this step.
Step 23:
In order to be able to insert the sealing strips, perform gradually: panel + sealing strip.
Step 25:
After this step, proceed with Arizona Breeze assembly instructions.
Step 26:
Carry out
steps 7-24
in the
Arizona Wave
assembly instructions, prior to carrying out this step.
Step 30:
Carry out
steps 27-29
in the
Arizona Breeze
assembly instructions, prior to carrying out this step.
Step 31:
Lay out all the panels and make sure they overlap, move one set of panels at a time in order
to connect them to the roof with the supplied screws. After this step, proceed with Arizona
Wave assembly instructions.
EN
IMPORTANT ASSEMBLY STEPS
When encountering this information icon during assembly, please refer the relevant assembly step for important additional comments.
Summary of Contents for CANOPIA ARIZONA ARCH
Page 13: ...SILICONE LUBRICANT SPRAY T h i s s i d e o u t UV THIS SIDE OUT Extension Kit 2 HE...
Page 19: ...SILICONE LUBRICANT SPRAY T h i s s i d e o u t THIS SIDE OUT Extension Kit 2 O RU...
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......