Installation manual
Base frame
(Foundation joists)
The base frame of the house must be completely flat and level to ensure that the installation proceeds
without problems.
ATTENTION: different house can have different foundation placements
– see the appended
base frame drawing (in Technical specifications)!
Place the impregnated foundation joists on the prepared foundation in accordance with the drawing at
equal intervals. Make sure that the joists are level and rectangular prior to screwing them together.
ADVICE
: It is recommended to place between the foundation joists and foundation a damp-proof
course that will protect the house from moisture and decay.
ADVICE
: To ensure protection from wind and storm, it is recommended to attach the foundation joists
to the foundation (for this, you can use for instance metal angles, anchors, etc.). The corresponding
materials are not included in the supplied kit!
Installation of foundation joists:
Walls
When installing the walls, it is important to remember that:
The logs are always assembled with their tongue upwards!
If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer!
Install the walls in accordance with the appended wall plans (see Technical specifications).
First of all place half logs of front and back wall at the
correct location and attach them with screws to the
foundation joists. Then install the side wall logs. Make sure
that the first layer of logs extends a bit over the foundation
joists: the logs must extend over the joists by some 3-5 mm.
You will thus protect the house from moisture, allowing the
free flow of rainwater into the ground.
ATTENTION
:
After the first layer of logs, measure the
diagonal lengths and, if necessary, re-install the logs. Only if
the diagonal lengths are completely equal is the base frame
rectangular and you can mutually attach the logs.
The first layer of logs:
Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary,
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door
and windows. You should definitely begin the door installation after the 5
th
-6
th
layer of logs.
Summary of Contents for FR44-4839
Page 61: ......
Page 62: ...BOX...
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ...3 1 SP2 5x80 RoR1 3 1 A A B 6x180 RoR1 5x90 5x90 5x80 RoR2 SP2 6x150 B SP1 SP2 SP2 SP2 2180...
Page 72: ...RE2 x RB2 x SP2 4 5x50 RE2 2 RE2 3 RE2 1 C C ca 25 ca 1 RB2 2 RB2 1...
Page 74: ...RE2 x RB2 x SP2 Rai7 Rai8 Rai7 Rai8 Rai7 Rai8 4 5x50 E E...
Page 75: ...19x114 19x114 RE2 x RB2 x SP1 underlayer is recommended SBS SBS SBS ca 200 SBS...
Page 76: ...SBS SBS SBS CoB CoB 4 5x50 SBS underlayer is recommende...
Page 77: ...GLUE 19x114 19x114 RE2 x RB2 x SP1 EPDM EPDM underlayer is recommend...
Page 78: ...EPDM CoB CoB 4 5x50 EPDM EPDM CoB2 19x114 19x114 RE2 x RB2 x SP1 EPDM underlayer is recommende...