Installation manual
Apex
In most cases, the apex is supplied in one piece (attention: in some house options, the apex can
comprise several parts! In this case, these parts will have to be screwed together prior to other
actions). Having installed the last wall logs, place the apex on the front and back walls and attach
them with screws.
The apexes have indents for the purlins. The purlins also have the corresponding indents, ensuring
that the roof is placed firmly and in the right place.
Now place the purlins in the
corresponding
indents
in
the
apexes.
Make sure that the upper wall log,
apexes and purlins are level.
Having fitted the purlins, screw
them onto the apex from above.
Installation of purlins:
ATTENTION
: If the wall logs are not properly pressed on top of one another without gaps, the upper
wall log may not be on the same level with the apexes. In this case you should tap the wall logs
downwards as necessary or plane the apex or sidewall log somewhat lower.
Roof
Before installing the roof boards, make sure that the house is completely level. Use the water-level to
check all walls.
ATTENTION
: When placing the roof, use a stable ladder. Do not step on the roof as the structure is
suitable to sustain only an even load (snow, wind, etc.), and not a point load!
Begin the installation of the roof boards
from the front edge of the roof
. Tap the boards lightly and
attach them from above and below with nails to the purlins and upper wall log.
ATTENTION
: Do not press the roof boards together too densely and you will avoid moisture-causing
bulging! Leave an interval of about 1 mm between the boards to allow for swelling.
During the whole process of installing the roof boards, make sure that their crest purlins coincide
and the eave sides of the boards extend at a uniform distance. Verify this with a rope or the lateral
eave lath that you may install for verification purposes.
The roof boards must be even with the purlin ends in front and behind. If necessary, saw both last
roof boards so narrow that they are even with the purlin ends.
Summary of Contents for FR19-3025
Page 5: ...234 254 279 311 6 3m ...
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ...EN Laying on concrete slabs not included FR Pose sur dalle béton non inclus 2790 2340 A B A B ...
Page 16: ...001 x14 007 x28 009 x28 001 009 007 007 009 ...
Page 20: ...RB1 1 x58 Ø2 5x50 x200 1 1 ...
Page 21: ...RE1 1 x2 x4 Ø2x16 x140 Ø3x30 x15 1 2 YPapp 1 RB1 1 RE1 1 Ø3x30 YPapp 1 2700 ...
Page 22: ...1 2 FaB3 1 x4 WB1 1 x4 Dia 1 x2 Ø3 5x40 x44 Ø2 1 FaB3 1 WB1 1 Dia 1 ...
Page 24: ...1 2 5 5 300 250 Ø3 5x25 Ø3 5x25 Ø4x16 Ø10 20mm Ø3 5x25 Ø2 1 Sla1 Ø4x16 Ø10 20mm ...