- 7-
Solar Application 3 (Most saving to use solar for space heating and DHW)
3.3 Pipe Connection
28mm pipe is recommended.
The pipe work must be flushed before the heat pump is connected, so that any contaminants
do not damage the components parts.
The heating/cooling water inlet and outlet direction must be connected according to the
marked areas on the heat pump.