PTV 33/44/55/66
Owne
r’s Manual
Rev. 1.0
18
4. Raise the platform to bed level:
Pushing the “UP” button, raise the platform to bed level.
5. Bleeding the system: With the platf
orm at bed level, push the “UP” button for thirty (30) seconds. This
will bypass hydraulic fluid through hydraulic poppet valves located in each of the lift cylinder pistons re-
turning hydraulic fluid back to the reservoir via the return lines.
UP
6. Closing and Storing of the Platform for transit: With the platform open at bed level us
e the “UP” button
and “CLOSE” button together, power the platform closed.
UP
OPEN
Summary of Contents for PTV 35
Page 1: ...PTV OWNER S MANUAL 04 21 ...