
5
Installing the lifting mechanism ..................................................... 27
Pre-assembling the lifting mechanism .................................... 29
Tail lifts PTC 750 L - 1000 LLW .................................. 29
Tail lifts with laterally adjustable bolted consoles ........ 30
Attachment of the lifting mechanism to the vehicle ................. 33
Positioning lifting mechanism under
the vehicle .................................................................. 34
Positioning and fixing the installation aids
on the vehicle chassis ................................................ 35
Bolting the lifting mechanism to the
installation aid ............................................................. 36
Positioning the stand tube / linkage mounts ................ 39
Fixing the console plates on the vehicle chassis ......... 41
Removing the installation aids .................................... 45
Installation of the hydraulic unit .............................................. 45
Establishing electrical connections ............................................... 46
Establishing the connection to the vehicle battery .................. 46
Establishing earth connection ................................................ 47
Connecting the acoustical signal generator ............................ 47
Installing and connecting the control unit ............................... 48
Attaching the control panel or Slimpanel ................................ 49
Connecting the manual cable switch (optional) ...................... 51
Radio remote control .............................................................. 52
Installing and connecting the platform .......................................... 53
Moving up and positioning the platform .................................. 54
Bolting the platform to the control rod..................................... 55
Bolting the platform to the tilt cylinders ................................... 56
Adjusting the tilt cylinders ....................................................... 59
Installing tilt sensors ............................................................... 60
Installing tilt sensor B15 .............................................. 60
Installing tilt sensor B15S ........................................... 62