background image

17

ACR

 air curtains 

Operation and Maintenance Documentation

10.

   OPERATION AND MAINTENANCE

The engine and fan of the ACR air curtains are maintenance-free devices but regular check-ups are advised, especially motor and 

bearing (fan’s rotor should rotate freely, free from any axial and radial throws/run-outs and undesired knocks/rattles. 

The heat exchanger requires systematic cleaning of all dirts /impurities off. Before the start of the heating period, the heat exchanger is 

advised to be cleaned with compressed air directed to the air outlets; there is no need for dismantling of the device. 

Pay special attention when cleaning the exchanger’s fin due to high possibility of damaging them. If the fin is bent use a special tool. If  

the device has not been used for a longer period of time, unplug it before the next use.

The heat exchanger is not equipped with any fire protection device. The heat exchanger may be damaged if the room temperature 

goes below 0°C; anti-freeze liquid must be added to the water circulation/system. Anti-freeze liquid must be appropriate for the material 

the exchanger is made of (copper) as well as other elements of the hydraulic system/circulation. The liquid must be diluted with water 

accordingly to the manufacturer’s recommendation.

NOTICE !

• Any and all repair and maintenance works must be conducted with the power off and the heat input 

disconnected.

• Only suitably qualified staff well acquainted with the safety regulations concerning handling with an 

electrical device must be employed when the device is being installed, started and operated

• In the event of coolant leak, when the water system is under pressure, any repairs of the leakage are 

strictly prohibited.

• Any repairs of the device must be conducted only if the device is disconnected from the power supply.

• If the device being operated gives metallic clatter, vibration or the level of noise is increasing, check 

if the mounting of the fan has not become loose – in case of any problems contact the installer of the 

device or Distributor’s Authorized Service immediately.

 

11.

   TROUBLESHOOTING AND TECHNICAL PROBLEMS

Possible problems and solutions are shown below. To eliminate a problem encountered contact the authorized service.

Fault, symptoms

Potential causes

Solutions

No heating, fan not operating

No power supply

Check the power switch Check the

power supply Check the power cable – if it is dam-

aged - replace the cable

Damage to the fan

Replace the motor

Damage to the switches on control panel

Check the switches – if are damaged – replace

Heating medium leakage

• 

leakage on joints with hot water supply system

• 

leakage in collector

Loss of tightness

Sealing supply system; repairing the heat exchanger

Heat output drop

Temperature of the heating medium differs 

from the required one Contaminated heat 

exchanger’s surface

Restore the temperature of the heating medium 

Clean the surface of the heat exchanger

Summary of Contents for ACR 1000W

Page 1: ...EN Operation and Maintenance Documentation www pakole com ACR_008_039_011_221021_V004_en Type ACR 1000W ACR 1000E ACR 1000C ACR 1500W ACR 1500E ACR 1500C ACR 2000W ACR 2000E ACR 2000C AIR CURTAINS...

Page 2: ...CE 3 3 BASIC TECHNICAL PARAMETERS 4 4 HEAT OUTPUT RANGES 4 5 Installation 6 6 CONTROL PANEL 10 7 ACR DOOR SWITCH 10 8 DIAGRAMS OF ELECTRICAL CONNECTIONS 11 9 DIMENSIONS OF THE ACR 1000 1500 2000 W E C...

Page 3: ...reduce the airflow in order to ensure the fire safety and if sparks or a damaged supply cable noticed discontinue the operation immediately Electricity network to which the curtain is connected shoul...

Page 4: ...r W 37 80 160 51 106 220 75 162 320 Electric heater consumption V Hz A Weight with water without water kg 15 18 5 25 Sound level dB A 45 50 60 46 50 61 47 50 61 Protection Class IP IP21 IP21 IP21 ACR...

Page 5: ...3 24 5 27 7 30 9 22 1 25 3 28 5 31 6 34 8 26 1 29 2 32 4 35 6 38 7 30 0 33 1 36 3 39 5 42 6 Water flow m3 h 0 4 0 3 0 2 0 2 0 1 0 5 0 4 0 4 0 3 0 3 0 6 0 6 0 5 0 4 0 4 0 8 0 7 0 6 0 6 0 5 0 9 0 8 0 8...

Page 6: ...ol panel With larger door openings it is possible to mount more curtains of the same type one by one to create an uninterrupted air flow The curtain is permanently mounted in either a horizontal or ve...

Page 7: ...the wall in a horizontal position using 2 mounting brackets to the horizontal system In the brackets there are 9mm holes for M8 screws In the EPP housing drill holes 12 13mm in front of existing hole...

Page 8: ...g drill holes 12 13mm in front of existing holes in the steel in take grille The exact location is indicated by special tags on the EPP housing and the figure below Then insert the spacer sleeves into...

Page 9: ...er use a vent which is located on the exchanger collector on the engine side ATTENTION It is necessary to ensure that the unit is properly leveled When it is mounted in a position other than vertical...

Page 10: ...L not supported function in this settings the device does not work To install the control panel unscrew the screw remove the front cover and panel board fix the panel to the wall and replace the panel...

Page 11: ...g The set does not include power cord or main switch Diagram of connecting one ACR 1000 1500 2000 W water heater and C without heater to the COMFORT panel Power supply 230V 50Hz Security system B4 Cro...

Page 12: ...B25 Control Panel COMFORT 3 speed fan control with thermostat OMY 5x 1 0mm In the MASTER curtain between the L1 NC terminal replace the factory made fuse C 3 15 with C 6 3 400V 50Hz power supply wire...

Page 13: ...control circuit between terminal 3 on Comfort Panel and Terminal 2 in the ACR curtain The on off switch itself should be installed in a place suitable for the curtain user Warning The Comfort Panel t...

Page 14: ...vated PP OPERATION Digital signal 1 potential free contact closed information about the operation of the curtain reed relay on door opened Digital signal 0 potential free contact opened Reed relay off...

Page 15: ...n the COMFORT panel in ON position READY FOR OPERATION 1 signal activated PP OPERATION Digital signal 1 potential free contact closed information about the operation of the curtain reed relay on door...

Page 16: ...16 ACR air curtains Operation and Maintenance Documentation 9 DIMENSIONS OF THE ACR 1000 1500 2000 W E C CURTAINS...

Page 17: ...f and the heat input disconnected Only suitably qualified staff well acquainted with the safety regulations concerning handling with an electrical device must be employed when the device is being inst...

Page 18: ...n suitable part and mending which is done by not authorized retailer or service station The regular maintenance is the owner s responsibility The manufacturer does not assume the responsibility in cas...

Page 19: ......

Page 20: ...PAKOLE TRADE Kft H 8000 Sz kesfeh rv r B rg ndi t 8 10 www pakole com mail pakole hu Tel 36 22 316 484 www pakole com...

Reviews: