16  

130715-24

©PACIFIC ENERGY FIREPLACE 
PRODUCTS LTD.

15"

381mm

21 1/2"

549mm

8"

203mm

11"

279mm

5"

127mm

3"

76mm

3"

76mm

Mobile Home

Minimum

Clearance to 

Combustibles

Additional Requirments:

Warning:

 Under no circumstances is this woodstove to be 

installed in a makeshift or "temporary" manner. It may be fired 
only after the following conditions have been met.

DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE 

SERVING ANOTHER APPLIANCE.

DO NOT INSTALL IN A SLEEPING ROOM.

- BOTH CHIMNEY SYSTEM AND CONNECTOR MUST BE 
6"(150mm) DIAMETER AND LISTED TO: 
  IN CANADA - ULC S-641 LISTED CONNECTOR AND 
ULC-S-629 LISTED CHIMNEY, 
   

IN USA -  UL-103 HT LISTED CONNECTOR AND CHIMNEY

- Outside air supply must be used for Mobile Home installa-

tions see Figure #11, Page 14.

- Remove the chimney down to the roof flashing to allow for 

transportation of the mobile home.

Double Wall Connector - Mobile Home

Clearances

This woodstove must be installed with a listed double-wall 

connector and compatible chimney system.

Clearances to combustible surfaces and materials are shown  

in Figure #13.

Clearances may be reduced with various heat insulating 

materials. Consult local fire codes and authorities for approval.

NOTE:

 Longer chimney lengths and different pitch flashings 

may be used. All other parts listed must be installed (see 

Figure #5, Page 12). Install all components to the connector 

or chimney manufacturer's installation requirements. Consult 
your chimney supplier for installation advice.

FIG. #13

Mobile Home Installation

Procedure:

CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE 
HOME FLOOR, WALL AND CEILING/ROOF MUST BE 
MAINTAINED.

- The services of a competent or certified installer, (certified 

by the Wood Energy Technical Training program (WETT) - in 

Canada, Hearth Education Foundation (HEARTH) - in U.S.A.,) 
are strongly recommended.

Note: See "Combustion Air" section on page 11.

1.  Position stove and floor protection with hole for combustion 

air in accordance with the clearances as stated on the 
label and in Figure #13.

2.  Mark the position for the hole in the ceiling and roof by 

using a string and plumb-bob.

3.  Check that the intended location will not interfere with floor 

joists, ceiling joists or rafters before proceeding further.

4.  Cut a hole in the ceiling and roof to suit the chimney 

system and frame in the sides. The chimney support is 
mounted to the framing.

5.  If the chimney connector exits the mobile home less then 7 

feet(2.1m) above the ground then a guard must be installed 
to cover the connector up to a height of 7 feet(2.1m).

6.  The guard must not have openings larger than 3/8"(10mm) 

and must maintain a space of 4"(100mm) minimum around 
the chimney connector.

7.  Assemble chimney sections so the finished length is resting 

on the support and protruding through the roof. Avoid 
having joints between ceiling and roof.  Install radiation 
shield. Assemble flashing and storm collar and be sure to 
maintain the vapour barrier at this point. (Seal securely.) 
Attach rain cap and check flashing for leaks.

8.  Install connector as per manufacturer's instructions.
9.  Attach stove to flooring using two 1/4" x  2" or longer lag 

screws.

Summary of Contents for NEO 1.6 INSERT

Page 1: ...ructions Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmental Protect...

Page 2: ...ictions and installation inspection requirements in you area Please read this entire manual before you install and use your new room woodstove Failure to follow instructions may result in property dam...

Page 3: ...e and must be lived with Regular inspection and cleaning is the solution The use of dry seasoned wood and am ple combustion air will help to minimize annoying smoke emissions and creosote buildup Chim...

Page 4: ...s burning on more than one side within one minute It is damp if it turns black and lights within three minutes If it sizzles hisses and blackens without igniting in five minutes it is soaked and shoul...

Page 5: ...with the pedestals Do not store paper or other stove lighting devices within the pedestal area Although this is possible it is not recommended NOTE Refer to local fire codes CAN B365 and NFPA 211 in...

Page 6: ...ramic glass only Do not substitute with any other type To remove broken glass remove the door gasket and then undo the eight screws securing the gasket guides and glass retainers Removeallparticlesofg...

Page 7: ...r riser tube in the back of the firebox Back side of airwash chamber located in the upper front of firebox Baffle locking pin Boost tube cover located in center of manifold bottom front of firebox Whe...

Page 8: ...atsecure hold down brackets to bottom pallet 4 Slide the hold down brackets away from the stove NOTE ALL DIMENSIONS IN INCHES MM Cast Iron Parts Removal and Installation 1 The Newcastle Top Assembly c...

Page 9: ...ver the flue collar Fig 3 4 Open the door slightly and lift the door to disengage the hinge pins from the hinge bracket 5 While supporting the side panel remove the two bolts securing the top of the s...

Page 10: ...dsofthecurvedbrackets behind the leg adapter cover Fig 6 10 Lift and turn the leg adapter down as shown in Fig 7 Remove the screws securing the leg adapter cover to the mounting brackets on the left a...

Page 11: ...ucture to prevent dislodging of the air duct To draw outside air from behind the stove an outside air adaptor may be required see Optional Blower section Cut or drill a 4 102mm hole through a wall beh...

Page 12: ...rformance Chimney flue exit is to be 3 feet 1 m above roof and two feet 0 6 m above highest projection within 10 feet 3 m The installation must meet all local codes Do not connect this unit to a chimn...

Page 13: ...idential Single Wall Connector Residential Alcove Min Height 7 Max Depth 3 18 457mm 12 305mm 25 1 2 673mm 20 508mm 8 203mm 11 279mm 5 127mm 15 381mm 3 76mm 8 203mm 3 76mm 8 203mm 8 203mm 21 1 2 549mm...

Page 14: ...ile homes Non combustible floor protector 48 1219 mm 3 914 mm Minimum Hooded vent or 90 elbow turned down The chimney may incorporate an offset To do this safely all sections of listed connector offse...

Page 15: ...nimum 7 2 1m Ceiling Height Non combustible floor protector 48 1219 mm Hooded vent or 90 elbow turned down Ensure that the Masonry chimney meets all National Fire Protection Association and local buil...

Page 16: ...upplier for installation advice FIG 13 Mobile Home Installation Procedure CAUTION THESTRUCTURALINTEGRITYOFTHEMOBILE HOME FLOOR WALL AND CEILING ROOF MUST BE MAINTAINED The services of a competent or c...

Page 17: ...urn on as the stove heats up to operating temperature It will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range Manual Tomanuallyoperatethebl...

Page 18: ...ed check flue Provide outside air for combustion 4 Door gasket leakage Replace gasket Check latch Excessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small...

Page 19: ...Baffle Pin SSER 125001 14 Ash System CA16 LGADA 15 Ash Dump Assembly NE16 7857 All parts may be ordered from your nearest Pacific Energy dealer http www pacificenergy net for the location of the deal...

Page 20: ...ant factor for maximum performance and part of this is understanding the basic functions of this design Traditionalwoodstoveshadabasiccombustionsystemwhich allowed a considerable amount of heat energy...

Page 21: ...99 NEO 1 6 Firebrick Installation Instructions This package contains 13 full size firebricks as well as 2 various cut size bricks With the heater in the upright position install firebricks as follows...

Page 22: ...operating correctly at installation Any part that shows in our judgment evidence of defect shall be repaired replaced or refunded at Pacific Energy s option The defective part may be required to be r...

Page 23: ...NSTALLATION ET D OP RATION FOURNI AVEC L APPAREIL CONTACTEZ LES OFFICIELS DE LA CONSTRUCTION OU DE SERVICE D INCENDIE POUR DES INFORMATIONS QUANT AUX RESTRICTIONS PERMIS D INSTALLATION ET INSPECTIONS...

Page 24: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 For technical support please contact your retailer Web site http www pacificenergy net Printed in Canada...

Reviews: