background image

4                                                                                                                                             FUSION_D1 081112-20

Maintenance Checks

Check the following parts for damage such as cracks, excessive corrosion, burned out sections 
and excessive warping: (See website for descriptions and more detail)

Weekly:

- Firebrick - Visual, for cracking.
- Door Gasket - sagging, placement, damage.

Monthly

 

- Brick rail tabs and brick rails.
- Air riser tube in the back of the fi rebox.
- Back side of airwash chamber.
- Baffle locking pin.
- Boost tube cover.

When Cleaning the 
Chimney System:

- Top baffle board/blanket.
- Baffle.
- Top heat shield and mounting bolt.
- Baffle Gasket.
- Brick Rails.
- Manifold.

Blower:

- The blower should be cleaned out a minimum every six months by using a vacumn on the grill 
openings in the back and bottom of the blower casing to remove any dust and debris.

- Some warping of the baffle is normal(up to 1/4” or .65cm).
- Replace if the baffle has permanent warping greater than this or has cracking or breakage.
- Please contact your Dealer if you experience any of the damage listed above. Continuing to 
operate your stove with broken parts may accelerate damage to other parts and may void your 
warranty

Summary of Contents for Fusion

Page 1: ...ions Contact local building or fire officialsaboutrestrictionsandinstallation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmental Protection Agency s July 1990 Particulate Emission Standards IMPORTANT THESE INSTRUCTIONS ARE TO REMAIN WITH THE HOMEOWNER SAVE THESE INSTRUCTIONS MODEL FUSION SERIES D PRODUCT CODES FSND MBKC FSND SSC SERIAL ...

Page 2: ...instructions may result in property damage bodily injury or even death Contents Safety and Maintenance 3 Maintenance Checks 4 Creosote 5 Formation and Need for Removal 5 Chimney Fires 5 In Case of a Chimney Fire 5 Avoiding a Chimney Fire 5 Stove Dimensions 6 Minimum Clearance to Combustibles 6 Mobile Home Installation 7 Clearances 7 Procedure 7 Listed Chimney and Chimney Connector 8 Residential In...

Page 3: ...llow instructions included in the DR31 WDGKIT kit obtainable from your nearest Pacific Energy dealer 5 DOOR GLASS Do not slam loading door or otherwise impact glass When closing door make sure that no logs protrude to impact the glass If the glass gets cracked or broken it must be replaced before using the stove Replacement glass can be obtained from your dealer Use 8 13 16 x 15 1 4 x 5 mm Ceramic...

Page 4: ...the Chimney System Top baffle board blanket Baffle Top heat shield and mounting bolt Baffle Gasket Brick Rails Manifold Blower The blower should be cleaned out a minimum every six months by using a vacumn on the grill openings in the back and bottom of the blower casing to remove any dust and debris Some warping of the baffle is normal up to 1 4 or 65cm Replace if the baffle has permanent warping ...

Page 5: ...must be lived with Regular inspection and cleaning is the solution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excessive creosote buildup is a chimney fire Chimney fires are dangerous Chimney inside temperatures can exceed 2000 F This causes much higher than normal temperatures in the chimney and on its exterior surfaces Thus ...

Page 6: ... 22 3 16 13 1 2 30 5 8 19 25 3 8 25 3 8 11 1 4 11 1 4 15 3 16 6 1 2 26 5 8 15 17 11 1 2 17 20 3 16 28 5 8 4 1 4 4 1 4 18 3 8 18 3 8 8 1 4 8 1 4 22 3 8 22 3 8 17 28 5 8 18 3 16 9 1 2 23 1 4 32 3 4 36 1 2 27 9 16 23 3 4 8 11 16 Minimum Clearance to Combustibles FIG 1 Alcove Min Height 7 1 2 Max Depth 4 Stove Dimensions FIG 2 ...

Page 7: ...tach stove to flooring using two 1 4 x 2 or longer lag screws Mobile Home Installation Warning Under no circumstances is this heater to be installed in a makeshift or temporary manner It may be fired only after the following conditions have been met DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE DO NOT INSTALL IN A SLEEPING ROOM Outside air supply must be used for Mobile Home...

Page 8: ...odel DBSP 3 Energy Vent 7 Industrial Chimney Model Excel Ultra Black 4 Selkirk Metalbestos Model DS 8 Simpson Dura Vent Model DVL B As well as one of the following compatible chimney systems All parts 6 CANADA ONLY Security Pro Jet ICC Selkirk Energy Vent S2100 H T 3000 Excel 2100 Sentinal CF Commander 5000 Ceiling support XSF FCS SF CF CSP CH6LCS Rafter radiation shield RRS 3 Chimney length XL3 S...

Page 9: ...ion within 10 feet 3 m The installation must meet all local codes Do not connect this unit to a chimney flue serving another appliance Double Wall Connector Use a listed double wall connector Install all components to the chimney connector manufacturer s installation requirements Single Wall Connector Smoke pipe must be as short and straight as possible use six inch diameter 24 gauge black pipe th...

Page 10: ...ct Outside air may also be ducted from outside through the 4 diameter hole in the rear of the pedestal enclosure if you remove the cover plate Fig 6 Note This unit is not designed to be operated with the firing door open In addition to the obvious hazard of sparks landing on combustibles an open fire door will cause the heater to draw air from the living space and possibly cause suffocation 2 Room...

Page 11: ...s it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting a Fire WARNING Never use chemicals or any other volatile liquid to start a fire 1 Move air control lever to the left most position maximum firing rate and open door 2 Place crumpled newspaper in the centre of the heater an...

Page 12: ... from your Pacific Energy dealer Re install baffle assembly in reverse order The two side pieces of insulation must be tight against the side rails Restarting After Extended or Overnight Burns 1 Open door and rake hot embers towards the front of the heater Add a couple of dry split logs on top of embers close door 2 Adjust air control to high control lever to the left and in just a few minutes log...

Page 13: ...ebox Fig 8 8 Install the two screws through the flange of the blower into the rear shield Fig 9 9 Plug the power supply cord in and check blower operation Power Cord Clearance Tab Temperature Switch Blower Operation Proper blower speed matched with air control setting will ensure peak performance from your stove Operate as follows Air control set to low right most position operate blower speed con...

Page 14: ...xcessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t Burn Overnight 1 Air control is set too high Set control lower 2 Not enough wood Unsplit wood is preferred for overnight burns 3 Draft too high Excessive chimney height and or diameter Stove Won t Burn 1 Comb...

Page 15: ...A B C as shown below if you are installing the optional ash cleanout system or 1 full brick in place of A B if you are not installing the ash cleanout system Next install the side firebricks 4 full size each side Lastly install 3 full size firebricks against the rear wall Cet emballage contient 17 briques réfractaires à pleine grandeur ainsi que 4 briques coupées de diffé rentes grandeurs Si votre...

Page 16: ...Black DRFS 4641 Stainless Steel 4654 9 Door Handle Assembly DRFS 4638 10 Boost Manifold 4105 11 Firebrick Set BRIC SSERA All parts may be ordered from your nearest Pacific Energy dealer Contact Pacific Energy for the location of the dealer 12a Brick Rail Set SSER RAILSET 13 Replacement Baffle Kit SSER DBAKIT 13a Baffle not sold separately SSER DBAF 13b Side Insulation not sold separately 5068 732 ...

Page 17: ...FUSION_D1 081112 20 17 ...

Page 18: ...18 FUSION_D1 081112 20 ...

Page 19: ...N LES INSTRUCTIONS D INSTALLATION ET D OPÉRATION FOURNI AVEC L APPAREIL CONTACTEZ LES OFFICIELS DE LA CONSTRUCTION OU DE SERVICE D INCENDIE POUR DES INFORMATIONS QUANT AUX RESTRICTIONS PERMIS D INSTALLATION ET INSPECTIONS DANS VOTRE RÉGION NE RELIEZ PAS CET APPAREIL À UN CONDUIT DE CHEMINÉE DESSERVANT DÉJÀ UN AUTRE APPAREIL ÉTATS UNIS SEULE MENT UTILISEZ UN RACCORDEMENT NOIR OU CLASSÉ DE 24 MSG ET...

Page 20: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan BC V9L 4T8 Phone 250 748 1184 Web site http www pacificenergy net ...

Reviews: