4
SPNE 190913-24
Maintenance Checks
Check the following parts for damage such as cracks, excessive corrosion, burned out sections and
excessive warping: (See website for descriptions and more detail)
Weekly:
- Firebrick - Visual, for cracking.
- Door Gasket - sagging, placement, damage.
Monthly
- Brick rail tabs and brick rails.
- Air riser tube in the back of the fi rebox.
- Back side of airwash chamber.
- Baffle locking pin.
- Boost tube cover.
When Cleaning the
Chimney System:
- Top baffle board/blanket.
- Baffle.
- Top heat shield and mounting bolt.
- Baffle Gasket.
- Brick Rails.
- Manifold.
- Some warping of the baffle is normal(up to 1/4” or .65cm).
- Replace if the baffle has permanent warping greater than this or has cracking or breakage.
- Please contact your Dealer if you experience any of the damage listed above. Continuing to operate
your stove with broken parts may accelerate damage to other parts and may void your warranty
Blowers:
- The blowers should be cleaned out a minimum every six months by using a vacumn on the blower
intakes to remove any dust and debris. See “Fan Speed Controller Relocation” section on page 9,
steps 1 & 2, for how to remove the panels and access the blowers.
Summary of Contents for DESIGN-E
Page 21: ...21 SPNE 190913 24 NOTES...
Page 22: ...22 SPNE 190913 24 NOTES...