Assembly - Super 27 only
Crate Removal
1. Carefully remove wood top and supports.
2. Remove plastic cover.
3. Using a 7/16" wrench, remove lag bolts that secure stove body to bottom pallet.
4. Place stove body carefully on its back.
5. Using two 3/4" wrench, remove 1" x 1/2" bolts and save for later use.
6. Remove pallet retaining brackets from stove bottom.
Optional Ash Cleanout System
1. Remove the ash system hole cover and gasket located under the stove. Discard cover plate and gasket.
2. Inside the stove, remove the two bolts for the ash dump from the firebox bottom (Figure 2) and insert into
the brick retainer with the flanges on the the brick retainer pointed up.
3.
4. Re-insert the bolts thru the brick retainer into the firebox bottom.
5. Place the provided gasket around the tube portion of the new Ash Dump.
6. Install Ash Dump system over the two bolts hanging downt and secure with the two nuts previously
removed.
Figure 2: Super 27 brick retainer.
SUPER-SD1_100517-32
9
5055.201