O
M
Z
Assembly
6
Installing roof panels
Detach hooks from loops on each sling.
Attach roof tubes (L) to one roof tube (K)
with washers (U) and bolts (R) with hex wrench
(X)
.
Cover both roof tubes (L) with hook and loop straps
and set roof tubes (K) in rails (F) and rail (G). Attach
roof tubes (L) to the other roof tube (K) with washers
(U) and bolts (R) with hex wrench
(X)
.
N
L
K
U
R
W
Press hooks on loops firmly.
Note that sling pa
nels
in the same rails
shall be
installed
in different layer
s so that one can
cover the other when in need.
7
Staking the pergola
Adjust each corner post upright.
Hammer two ground stakes through the holes of
each post base (M) into ground. You can use the
puller
(Z)
to slide each sling panel
along
rails.
8
Summary of Contents for 5HGZ1989-WBS
Page 3: ......