
System Operations Manual
www.paceworldwide.com
Page 38 of 38
THIRD ADDENDUM - CORRECTIONS
Section 5d
Step i. To rotate the nozzle, first loosen the retention screw in front of the housing.
Section 5e
Step xi. Initiate prism calibration sequence. Further explanation is in par. 5j.
Section 6a Production Procedure.
Step ix. The component needs to be oriented the same as the nozzle. To rotate the
platform, loosen the retention set screw, turn to align the component with the nozzle, then tighten
the set screw.
Section 6c, Profile Development Install Procedure.
Step i. Mouse click on Profile for the Profile Development Screen. (Figure 7)
Step ii. If the component needs to be placed first, conduct steps ii to xv in paragraph 6a, then
do sections iv thru x below.
After Section 6c. vii.
Section 6d. Profile Development Removal Procedure
Step i. Load PCB and align component with red laser light roughly in the center of the
component.
Step ii. Click on Load PCB button.
Step iii. Click on Lower Heater Arm button.
Step iv. Align component so nozzle will fit down over without contacting the component.
Click on Align component button.
Step v. Adjust nozzle flush with the PCB using the up and down arrows. Click on Lower
Nozzle button.
Step vi. Click Start button to begin profile.