2
MAN 9029313 EN V1
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tel.: +45 70212626
6600 Vejen, Denmark
E-mail: [email protected]
Assembly Instructions
Fit the support frame to the hopper using the
accompanying 5 x 35 bolts.
Fitting
Ideal for mounting on the front or rear of an ATV’s carrier using U brackets and clamp
fitting. Some minor adaptation may be required, depending on the make and model
of the ATV. The connection of an extra battery may be required, depending on the
ATV’s power supply.
User instructions
•
Fill the hopper with the spreading material.
•
Open the butt plate in the bottom and adjust and close using the cable
adjustment’s operating lever.
•
Switch on power for the spreader’s electrical motor.
•
Regulate the spreading quantity using the operating lever.
Calibration/preparation
•
Measure the area for spreading, e.g. 25 m
2
or 50 m
2
.
•
Fill the hopper with the desired amount of granulate.
•
Set the adjustment handle in the middle position.
•
Move with the desired forward speed.
•
Set the handle to achieve the desired spreading amount.
•
Several attempts may be required for this, as well as the driving speed may
need to be changed.
•
Each type of granulate must be calibrated separately. (Spreading material)