Self-priming Pump

4

The principle of the station is that the water 

supply network is always under pressure. If 

you turn on a tap or other device, the pres-

sure in the system will begin to drop. When 

the  pressure  drops  below  0.15  MPa  (1.5 

atm.), The pressure switch will automatically 

turn on the pump, and it compensates for the 

water fl ow. When you close the tap, the pump 

will run for a while.

Water will fi ll the accumulator, and when the 

pressure in the system rises to the initial state 

of 0.3 MPa (3 atm.), The pump will automati-

cally turn off  using a pressure switch.

Station installation and commis-

sioning

Before connecting, be sure to check the com-

pliance of the electrical and pressure data of 

the product with the parameters of your elec-

trical and water supply network.

It is desirable that the installation and com-

missioning of the station be carried out by a 

specialized installation organization. The sta-

tion should be secured to a rigid base.

To reduce noise and vibration during the op-

eration of the station, its fastening to the base 

should be carried out through rubber washers 

and gaskets.

ATTENTION! 

A prerequisite for the operation 

of the station is the presence of a 1 ”check 

valve at the inlet of the suction line (not in-

cluded in the set).

Connect a suction pipe with a 1 ”check valve 

at the end to the station inlet (7). Connect a 

standpipe to the station outlet (8). The suction 

line is made from an incompressible hose or 

pipe.

ATTENTION! 

The diameter of the hose or 

pipe must exactly match the diameter of the 

pump inlet - 1 inch.

Avoid connections that narrow or widen the 

fl ow area of   the hose or pipe. The installation 

of fi lter elements on the suction line is strictly 

prohibited.

ATTENTION! 

All connections of the suction 

and pressure pipelines must be tight.

Installing a suction line with a length of more 

than 10 meters horizontally is not advisable, 

as this will lead to a decrease in the suc-

tion lift. When installing the suction line, it is 

necessary to ensure a continuous angle of 

inclination from the station to the water intake 

source of at least one degree to the horizon, 

reverse angles on the suction line are not al-

lowed.

Electrical connection

ATTENTION!

  The  electrical  connection 

should only be carried out after all hydrau-

lic  connections  have  been  completed.

The electrical connection must be carried 

out  by  a  qualified  technician. The  station 

should be installed in such a way that easy 

access to the electrical outlet is provided. 

The socket should only be used for powering 

the station, be grounded and connected to 

a high sensitivity (30 mA) differential circuit 

breaker. The installation location of the sock-

et must be protected from splashing water.

ATTENTION! 

It is forbidden to operate the 

station with a damaged electric cable. In case 

of damage to the electrical cable, you must 

contact the service center to replace it.

Commissioning

At the initial start-up, it is necessary to pre-

fill the pump and the suction line with water 

through the fi ller hole (9). To do this, unscrew 

the plug and fi ll with water until water begins 

to flow out of the filler hole without air bub-

bles, then screw the fi ller plug. Before starting 

the station, it is necessary to check the air 

pressure in the accumulator using a car pres-

sure gauge by connecting it to the pneumatic 

valve (6), it should be 0.15 MPa (1.5 atm). If 

necessary, pump air into the accumulator us-

ing a car pump, otherwise the diaphragm may 

rupture.

After opening all water intake taps to remove 

air from the pressure line, connect the station 

to the power grid. The station pump will start 

to deliver water.

Service

Have your power tool repaired only by quali-

fi ed personnel and only with original replace-

ment parts. This ensures the safety of the 

power tool.

For a list of authorized service centers, see 

the offi  cial P.I.T. link https://pittools.ru/servis-

es/

Storage and transportation

Storage:

drain the suction and discharge pipes

unscrew the drain plug and let the water drain 

out of the pump

screw  the  drain  plug  again  and  store  the 

pump and accessories in a frost-protected 

place, at a temperature of 0 to + 35 ° C and a 

relative humidity of no more than 80%.

Products can be transported by any type of 

closed transport in the manufacturer’s pack-

aging or without it, while preserving the prod-

uct from mechanical damage, atmospheric 

Summary of Contents for POG750-P

Page 1: ......

Page 2: ...Self priming Pump 1 1 4 5 6 2 3 7 9 10 8...

Page 3: ...ed for use and appropriately marked electrical tricic extension cords with sufficient cross section of the wire Do not use the mains power cable for transportation or xation device When disconnecting...

Page 4: ...nd gen eral instructions may result in electric shock re and or serious injury Please observe the illustrations at the begin ning of this operating manual Intended use The pumping station is designed...

Page 5: ...ource of at least one degree to the horizon reverse angles on the suction line are not al lowed Electrical connection ATTENTION The electrical connection should only be carried out after all hydrau li...

Page 6: ...he product seri al number from left to right Year of production the third and fourth digits indicate the month of production the fth and sixth digits indicate the production day TERMS OF WARRANTY SERV...

Page 7: ...anthers piston and sealing rings during the warranty period is a paid service The service life of the product is 3 years Shelf life is 2 years It is not recommended for oper ation after 2 years of st...

Page 8: ...7 30 1 35 10 2 16...

Page 9: ...8 P I T https pittools ru servises 1 2 3 4 5 6 M POG750 P 220 50 750 2 8 3 45...

Page 10: ...9 M POG750 P 24 L 8 17 1 1 P I T 1 2 3 4 5 6 7 8 9 10 JS 8 0 15 1 5 0 3 3 1 1 7 8 1 10 30...

Page 11: ...10 9 6 0 15 1 5 P I T https pittools ru servises 0 35 80...

Page 12: ...11 2 2 2 1 2 OnePower 12 I 3 4...

Page 13: ...12 3 2 2 5...

Page 14: ...the Warranty Card the boxes shall be lled out by a seller and to a x the seal of the trade organization in the Guarantee Certi cate and the Warranty Card Warranty By this Warranty Certi cate P I T com...

Page 15: ...14 I ___________ _____ ____________________ I I www pittools ru I I I 12 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ________________________ ________________...

Page 16: ..._______________________________ Serial Number___________ Sale Date ____________20__ Place of Seal Filled out by a Seller WARRANTY REPAIR CARD Date of Acceptance for Repair _______20___ Application for...

Page 17: ...0__ ___20__ ________________________________ ___________ ________20__ Place of Seal O O _______20___ ___________________ _____________________________ ________________________ _____________________ __...

Page 18: ......

Reviews: