Page 9 of 14
Setting up the awning
Step 7:
Unroll the Awning. Twist to unlock awning poles and twist again to lock at desired height. Attach poles to
the Awning and secure with guy ropes.
Setting up the Oztent RS-1
Step 5:
Adjust the Swag so it sits properly. Hammer in all pegs. Peg out guy ropes at 45 degree angle to
secure the swag.
Step 6:
Place the RS-1 Swag mattress inside the Swag. Position it within the frame at the base of the Swag.
OPTIONAL: Lower one pole during heavy rain
Summary of Contents for OSR01SWLUB
Page 1: ...OSR01SWLUB OWNER S MANUAL...