background image

1. Remove all tent contents from stuff sack. 
2. Assemble hub/pole (and 2 single poles for SH3) and lay tent body on ground.

• 

SH1:

the pole has one hub, with the longer section attaching to the grommet in the 

center rear. 

• 

SH2 / SH3:

the pole has two hubs. The hub with the longer pole sections corresponds 

with the front of the tent.

3. Insert pole tips into grommets on tent body. 
4. Hook all plastic clips to poles to create freestanding mesh tent body.

• 

SH3:

leave clip in middle of spine unattached until after you insert the short pole 

into the two webbing pockets on the tent body (perpendicular to ridge pole). Then, 
attach the final clip on the tent body to the pole. 

5. Drape tent fly over set-up tent body and clip all corner buckles of fly and body 

together, cinching tightening straps. 

6. 

SH3:

Clip buckles of fly and tent body together at rear first. Run vestibule pole through 

sleeve on underside of fly and insert pole tips into grommets on tent body. Then, clip 
buckles of fly and tent body on front corners and cinch tightening straps.

7. Stake out all corners and guy lines for optimum stability, space and ventilation.

Separate 6", large diameter pole segment included for emergency field repair. 

Slide repair pole over the break to act as a splint. 

If you purchase the optional Big Agnes footprint for any of our models, it will enable you

to pitch a Fast Fly shelter while leaving the tent body behind. The Fast Fly configuration
requires the footprint, tent fly, poles and stakes. 

1. Lay the foot print on the ground and stake out. 
2. Assemble hub/pole and insert pole tips into grommets on foot print, matching the longer 

pole sections from the hub with the front of the tent where the vestibule will be. 

SH3:

Also has a single vestibule pole. The short cross pole will not be used. 

3. Drape fly over the poles and clip buckles of fly and footprint together, cinching tightening straps.
4.

SH3:

Clip buckles of fly and footprint together at rear first. Run vestibule pole through 

sleeve on underside of fly and insert pole tips into grommets on footprint. Clip buckles on 
front corners and cinch tightening straps. 

5. Stake out all corners and guy lines for optimum stability, space and ventilation.  

SH3:

For 

maximum headroom and to keep fly tight, stake out upper guy lines on side of tent

SEEDHOUSE 1, 2 AND 3 SET UP INSTRUCTIONS

FAST FLY SET UP INSTRUCTIONS

• Our tents are easy to set up but we suggest you practice once at home before using 

them for the first time to avoid late night bickering with tent mates while fumbling 
around in the dark.

• Before pitching tent, clear campsite of debris that may pierce tent floor.
• Big Agnes tents are all freestanding, but we recommend staking them out to increase 

space and keep your tent from becoming a tumbleweed.

• Hang onto your stuff sacks or they’ll blow away and create backcountry litter.
• Pull on the pole sleeve fabric when inserting poles to avoid any bunching in the material.
• Push rather than pull poles through pole sleeves.

HELPFUL HINTS FOR TENT SET UP

Cut here to remove. Do Not Tear!

k

seedhousesetupinst08  10/30/07  12:35 PM  Page 1

Reviews: