Praktika T-03-M(K) turnstile
16
All of the above maintenance operations are performed for both
tripods.
6. Assembling and operation checking of the turnstile
6.1. If any troubles or defects are found out during MO it is advised
to contact our service department for advice, contact details are available
online:
www.oxgard.com
6.2. If it is necessary to repair damaged painted surfaces, powder
paint identical to the damaged (RAL9005) shall be used in accordance
with instructions for its use.
6.3. Reassemble the turnstile in reverse order.
6.4. Turn on the turnstile and perform functionality check by making
several passes and activating “antipanic” mode.
6.5. If there is no extraneous noise or any abnormality in the turnstile
work it is ready for operation.
Summary of Contents for Praktika T-03
Page 2: ......
Page 7: ...Maintenance operations 7 Fig 2 Central stand of turnstile Fig 3...
Page 9: ...Maintenance operations 9 Fig 5 Central stand of turnstile Fig 6 Central stand of turnstile...
Page 15: ...Maintenance operations 15 Fig 14 Central stand of turnstile Fig 15 Central stand of turnstile...
Page 17: ...Maintenance operations 17...
Page 18: ...Praktika T 03 M K turnstile 18...
Page 19: ...Maintenance operations 19...