STEP 33
Once the STORE button becomes active, press
<F2>
to store the data point. If this is the first fiber in
the link, you may be prompted to enter a new label.
STEP 34
Press
<F3>
to save the data point.
STEP 35
Disconnect the patch cables from the patch panels and move them to the next port in the patch panel,
then repeat steps 33 through 35 until all fibers in the link have been tested.