Step 2 – Install Array in Rack
Install Rack Tray
1.
Install the
screw clips
on the inside of the square-holed
rack rails as shown in the graphics to the right.
Three on the right and two on the left.
2.
Install the
Right tray rail
:
a.
Position the rail with the
front flange
(labeled RF for
Right Front) outside the rack rail and the bottom hole at
the bottom of the 2U space.
b.
Use two gold screws to secure it.
c.
Repeat
to secure the
rear flange
(label RR
for Right Rear).
3.
Left tray rail
(LF and LR).
Insert Array in Rack
WARNING:
It is recommended that a mechanical lifter (or at
least two people) be used during rack installation or removal
to prevent injury.
AVERTISSEMENT:
Pour éviter toute blessure il est
recommande qu'un monte-charge (ou deux personnes au
moins) soit utilisé lors de l'installation ou de l'enlèvement du
support.
1.
Use a mechanical lifter to position the
E1000
chassis
in
front of the rack.
2.
Slide the unit onto the
rack tray
until it stops.
3.
Use three black screws in the
front flange
holes to secure
the unit to the vertical rack rails.
Step 3 – Install the Drives
Drive Bay Numbering
The drives can be installed into any bay in the enclosure.
NOTE: While drives having different capacities can be installed in
the unit, they should be installed as part of different RAID sets
because capacity usage of all drives in a single RAID is limited to the
capacity of the smallest drive in that RAID set.
Front Clip
Locations
Rear Clip
Locations
Front
Screws
1
2
3
4
5
6
7
8
9
10
11