en
11
4
Initial commissioning
When the hydraulic system is fi lled and ready for op-
eration, connect the controller to the mains.
The controller runs an initialisation phase in which the
directional pad fl ashes red.
When the controller is commissioned for the fi rst
time or when it is reset, it will run a commissioning
menu after the initialisation phase. The commissioning
menu leads the user through the most important ad-
justment channels needed for operating the system.
Commissioning menu
The commissioning menu consists of the channels de-
scribed in the following.
1. Language:
Î
Adjust the desired menu language.
2. Units:
Î
Adjust the desired temperature unit.
Î
Adjust the desired volume unit.
Î
Adjust the desired pressure unit.
Î
Adjust the desired energy unit.