![Outsunny SUNDEAR GS 1500 Assembly & Operation Instructions Download Page 5](http://html.mh-extra.com/html/outsunny/sundear-gs-1500/sundear-gs-1500_assembly-and-operation-instructions_1661824005.webp)
Page
5
of
7
INSTALLATION
Important:
Ensure the supply cables are well mounted and that it does not come into contact with
the reflector of the heater or that does not trail into heated area.
1.
This heater should be installed by a competent person, i.e., a qualified electrician.
2.
Always disconnected the heater from the electricity supply and allow it to cool before moving.
3.
This heater can be heat directly.
4.
The supply cable must be at the lower end of the heater if the heater is installed at an angle
or vertically.
5.
Keep the supply cord away from the body of the heater which will get hot during use.
6.
Do not install the heater on an inflammable surface.
7.
Observe the minimum safe distance between the heater body and the inflammable surfaces
when mounted.
8.
If the heater is to be used outside, a weatherproof outlet is recommended.
9.
Before drilling ensure that there are no wires or water pipes in the area where the heater is to
be installed.
10. The heater must be installed on the mounting chain provided.
11. Fasten the chain securely to the mounting surface.
12. Fasten the heater securely on the chain.
Installation steps:
First, connect the chain and connecting ring with a carabiner. (as shown in Fig.1) 2nd Hang the
chain on the rail and then lock it with a carabiner. (as shown in Fig.2).
○
1 chain -1pc
○
2 carabiner - 2pcs
Summary of Contents for SUNDEAR GS 1500
Page 8: ......