Page 26
47.
Overhang the
Metal Roof Panels
past the
Battens
on front and rear of shed by approxi-
matley 1”. Adjust panels side-to-side to achieve desired width. Overall width past the
Battens
can vary from 1” - 3” depending on your preference. The overhang over the side of the shed will
be set by the
Metal Roof Hangars
, but should be approximatley 4” on side of shed.
Approximatley 4” of
overhang past Rafters.
48.
Once the Metal Roof Panels are spaced correctly from side-to-side and top-to-bottom, lift
3 panels up and run a bead of caulking down the overlapping seams of each panel to seal the
joints. Place panels down one by one once seam is caulked. You will likely need assistance
from a helper for this step. Caulk each seam.
Bead of caulking
Bead of caulking
49.
Using
6 - 2” Metal Screws
and
1/4” Nut Driver
(included), partial-
ly secure
Metal Roof Panels
to 2nd row of
Battens
from top. Only fasten
screws halfway so that
Metal Roof Hangars
can be removed in
Step 50
.
Metal screw is self-tapping, screw into center of Battens
Hardware (Step 49)
2” - Metal Roof Screws
x 6
total
Important:
Metal Roof Hangars
will be removed in
Step 50.
Screw into center
of Battens. 2nd row
from top.
Screw into
peaks of roof
panels