background image

Page 9

18. Install wind support bars starting in back (Item 5), up through center (Item 6), then between the front and center

main frame bars (Item 7) and finally with adjustable wind support bar (Item 8) in front. Ref Diagram 16.

Diagram 16

Bottom Main Frame Bar

Front  Main Frame Bar

Center Main Frame Bar

Back Main Frame Bar

5

6

7

8

17. Set up main frame bars by grasping with both hands and pushing upward until button clicks into place. Start with

bottom main frame bar and continue to the back main frame bar pushing lengthened bars into appropriate position
Ref. Diagram 15.

Diagram 15

Bottom Main
Frame Bar

Front Main
Frame Bar

Center Main
Frame Bar

Back Main
Frame Bar

Note:

Note:

Note:

Note:

Note: Seat
assembly not
shown for clarity

Note:

 There are two

holes that the buttons can
click into to optimize the
fit of the canvas.

Summary of Contents for Pro XT Lodge

Page 1: ...Seat 16 2 200369 Seat Bracket 17 2 200806 Seat Base 18 1 200379 Seat Rail 67 19 2 200196 Seat Rail Cap 20 2 200376 Seat Rail Bracket 21 8 200384 Sleeve 22 16 400641 8 x 3 4 Self Tapping Screw 23 8 20...

Page 2: ...ve the bolts loose enough to allow them to be adjusted Tools Required Ratchet 7 16 socket 7 16 wrench Short extension for Ratchet or 7 16 deep socket Drill Driver Phillips Bit Phillips Screwdriver Wre...

Page 3: ...the fit is correct 3 Line up the swivel with the inserts in the bottom of the seat Loosely install the x Phillips head bolt with washers included in the seat box into the inserts in the bottom of the...

Page 4: ...5 16 bolts and nuts The bracket with the greater angle goes toward the front of the sled Attach plastic end caps onto the seat rail using the self tapping screws A small pilot hole may be drilled to e...

Page 5: ...e WD 40 or silicone to lubricate plastic seat base opening so it will go onto the aluminum rail easier Install plastic end caps here Secure with self tapping screws Install seat rail here Some downwar...

Page 6: ...m 8 3 25 28 4 7 Position sled Item 1 as shown in Diagram 7 with curved front to your left 8 Drill the 4 marked holes using a 5 16 bit 9 Drill the 7 16 hole in center of lip approximately 16 from bend...

Page 7: ...the sleeve Item 21 over the main frame extension bar Item 11 Line up holes with button lock press lock in as you slide over the bar Insert the black plug Item 23 into the main frame extension bar Ite...

Page 8: ...he main frame extension bar Item 10 Line up holes with button lock press lock in as you slide over the bar Insert the black plug Item 23 into the main frame extension bar Item 10 Insert outer main fra...

Page 9: ...r Item 34 Slide the sleeve Item 21 over the main frame extension bar Item 9 Line up holes with button lock press lock in as you slide over the bar Insert the black plug Item 23 into the main frame ext...

Page 10: ...ame Bar 5 6 7 8 17 Set up main frame bars by grasping with both hands and pushing upward until button clicks into place Start with bottom main frame bar and continue to the back main frame bar pushing...

Page 11: ...l be necessary to loosen the back adjustable wind pole to achieve this Once the front is set and the top wind poles are in place the back adjustable wind pole can be extended until it is snug Install...

Page 12: ...lity dark or during limited visibility dark or during limited visibility dark or during limited visibility To Collapse Tent and Transport 1 Remove support bars and store inside the sled 2 Retract main...

Page 13: ...Page 12 Otter Pro XT Lodge October 2015 Otter Outdoors Inc 411 W Congress St Maple Lake MN 55358 Phone 320 963 6480 www otteroutdoors com...

Reviews: