background image

           

 

ET8122MPH-S-DR   

Hardened 8-port 10/100TX + 2-Port 10/100/1000T/100/1000 SFP Combo with 8 PoE Injectors 
Industrial Ethernet Switch 

 

DIN-Rail Mounting

 

The DIN-Rail is screwed on the industrial switch when out of factory. If the DIN-Rail is not screwed on the industrial switch, please see the 

following pictures to screw the DIN-Rail on the switch. Follow the steps below to hang the industrial switch. 

 

 

 

 

 

1. First, insert the top of DIN-Rail into the track.   

2. Then, lightly push the DIN-Rail into the track.   

3. Check if the DIN-Rail is tightened on the track or not.   

4. To remove the industrial switch from the track, reverse steps above. 

 

 

 

Summary of Contents for ET8122MPH-S-DR

Page 1: ...r Input 2 48VDC GND Power Ground Earth Ground FAULT The relay opens if PWR1 or PWR2 fails 1A DC Terminal Block Power Inputs There are two pairs of power inputs can be used to power up this media conve...

Page 2: ...speeds of 10 100 1000Mbps that support auto sensing technology to enable each port to detect the connecting speed The mini GBIC port is a joint for a mini GBIC SFP transceiver so the switch can be up...

Page 3: ...32 connector and the other end is RJ 45 connector Attach the end of RS 232 connector to PC or terminal and the other end of RJ 45 connector to the console port of the switch The connected terminal or...

Page 4: ...s to match the following default characteristics of the console port Baud Rate 9600 bps Data Bits 8 Parity none Stop Bit 1 Flow control None The settings of communication parameters Having finished th...

Page 5: ...ndustrial switch is the master of X Ring group Off The industrial switch is not a ring master in X Ring group PWR1 Green On Power 1 is active Off Power 1 is inactive PWR2 Green On Power 2 is active Of...

Page 6: ...from the TX device Off No device attached Amber On The port is operating in full duplex mode Blinking Collision of Packets occurs Off The port is in half duplex mode or no device is attached FWD P1 P8...

Page 7: ...actory If the DIN Rail is not screwed on the industrial switch please see the following pictures to screw the DIN Rail on the switch Follow the steps below to hang the industrial switch 1 First insert...

Page 8: ...with wall mount plate 1 Remove the DIN Rail from the industrial switch loose the screws to remove the DIN Rail 2 Place the wall mount plate on the rear panel of the industrial switch 3 Use the screws...

Page 9: ...ssembly Startup and Dismantling Wall Mounting Kit installation Assembly Securely fasten the wall mount kits to the bottom of module by using the provided screws 6 pcs Mount the standalone unit onto a...

Reviews: