14
Installation
4 Installation
The installation of the SYMPL relay Node consists of mounting the device,
connections to loads, to e:net, and to power supply.
The sequence of cabling is not defined. Supply the SYMPL relay Node with
power after all cabling is completed; it starts booting.
4.1
Installation conditions
Installation position:
Terminals on top and bottom
Horizontal spacing:
No spacing necessary
Minimum vertical rail grid spacing:
115 mm (90 + 25 mm)
(excluding conduit)
Recommended vertical rail grid spacing:
160 mm (with 40 mm conduit)
Installation location
Indoor
4.2
Mounting process
The e:cue SYMPL Node is designed to mount onto a 35 mm DIN rail
(EN 60715) in a vertical position.
!
Connect cables and data only when the device is powered
down.
!
Each cable should not exceed a length of 30 m.