OSO Slimline-RI 150 Manual Download Page 13

13

4.6  Y-plan wiring layout

OSO Slimline cylinders can be fitted with all types 

of boilers. Standard boilers operate using room 

and cylinder thermostats. Please follow upper 

diagram: ‘Wiring for Standard Boiler’. 

Y-plan systems with unvent-ed cylinders require 

use of both a mid-position valve and the supplied 

RESET    

  RE

SET

M2

1

2

3

4

1 2

E

2

3

1

T6360B

B1

O

G

Br

G/Y

3

3 1

4

N

L

E

N

L

E

N

L

ST6400

Boiler

Pump

3

2

1

3

2

3

2

2

2

3

1

V4043H

Room 

thermostat

Zone Valve (DHW)

(supplied)

Thermal Cut Out/Thermostat

(supplied)

Isolated Mains

Supply From

Fused Spur

L N E

Mid Position Valve

(not supplied)

6

W

B1

G/Y

Gr

O

2

3

V4073A1039

10

4 5

9

8

7

RESET    

  RE

SET

M2

1

2

3

4

1 2

E

2

3

1

T6360B

B1

O

G

Br

G/Y

3

3 1

4

N

L

E

N

L

E

N

L

ST6400

Boiler

Pump

3

2

1

3

2

3

2

2

2

3

1

V4043H

Room 

thermostat

Zone Valve (DHW)

(supplied)

Thermal Cut Out/Thermostat

(supplied)

Isolated Mains

Supply From

Fused Spur

L N E

Mid Position Valve

(not supplied)

6

W

B1

G/Y

Gr

O

2

3

V4073A1039

10

4 5

9

8

7

zone valve. Failure to use the zone valve contra-

venes regulations.

Both wiring plans shown is based on the use 

of a 10-way Junction Box (Honey-well Part no. 

42002116-001). Junction Box terminal 8 is switched 

live and, if needed, terminal 10 is pump live. 

Wiring for standard boiler

Wiring for thermistor controlled boiler

Spare parts, see pt. 4.4

Piping diagram, see pt. 2.8

Spare parts, see pt. 4.4

Piping diagram, see pt. 2.8

Summary of Contents for Slimline-RI 150

Page 1: ...y OSO Hotwater AS Industriveien 1 3300 Hokksund Norway Tel 47 32 25 00 00 Fax 47 32 25 00 90 E mail oso oso no www osohotwater com Slimline RI 150 l EN SAFETY INFORMATION O M INFORMATION INSTALLATION...

Page 2: ...4 5 S plan wiring layout 12 4 6 Y plan wiring layout 13 5 Maintenance safety and servicing 5 1 Draining flushing 14 5 2 Recommissioning 14 5 3 Safety and maintenance 14 5 4 Corrosion resistance 14 5 5...

Page 3: ...hould be filled with water before the power is switched on Maintenance settings should only be carried out by persons over 18 years of age with sufficient understanding CAUTION The product must not be...

Page 4: ...ssioning of the cylinder This manual gives detailed advice for installation and should be read carefully prior to fitting any unvented unit OSO Slimline cylinders are not suitable for gravity fed prim...

Page 5: ...ently frost free position The product should be placed on a floor or wall suitable for the total weight of the prod uct when in operation See type plate The product must have a clearance for servicing...

Page 6: ...m standing pres sure of 2 5 bar and a flow rate of 20 litres per minute with a 1 bar dynamic pressure is recommended The cylinder will operate at lower pressures and flow rates however the performance...

Page 7: ...s tee 9 If a balanced mains pressure cold water supply is required to a shower or bidet over rim type only remove the blanking cap from the pressure reducing valve 3 and connect to the shower or bidet...

Page 8: ...pi cally be 82 C 16 For electrical connection of the motorised valve and immersion heater please read Electrical Installation Instructions Tundish 17 Install the Tundish 6 in a vertical position withi...

Page 9: ...low 2 port valve supplied Zone valve not supplied Automatic bypass Radiators UFH Boiler Pump flow 2 port valve supplied Mid pos valve not supplied Radiators UFH Boiler Automatic bypass S plan piping d...

Page 10: ...ng System flushing will not be necessary under nor mal circumstances as the line strainer will prevent ingress of foreign materials however if flushing is required run at least 50 litres of water from...

Page 11: ...torized valve To comply with regulations governing the in stallation of indirect unvented cylinders a mo torised valve must be fitted in the primary flow or return Your OSO unit has been supplied with...

Page 12: ...10 RESE T R E S E T M2 1 2 3 4 RESE T R E S E T M2 1 2 3 4 1 2 E 2 3 1 T6360B B1 Br G O G Y 3 5 7 3 4 N L E N L E N L ST6400 Boiler Pump 3 2 1 3 2 3 2 2 2 3 1 V4043H Room thermostat Zone Valve DHW sup...

Page 13: ...ed 6 W B1 G Y Gr O 2 3 V4073A1039 10 4 5 9 8 7 RESE T R E S E T M2 1 2 3 4 1 2 E 2 3 1 T6360B B1 O G Br G Y 3 3 1 4 N L E N L E N L ST6400 Boiler Pump 3 2 1 3 2 3 2 2 2 3 1 V4043H Room thermostat Zone...

Page 14: ...cold water supply and open a ground floor cold tap 2 Unscrew the pressure reducing cartridge 3 Clean the filter mesh and the cartridge under running water 4 Replace cartridge ensuring that strainer is...

Page 15: ...15 5 5 Spare parts Pressure reducing valve Cartridge Part No REDC 355030 3 bar Expansion valve Cartridge and seat Part No 214005 6 0 Bar Expansion valve Part No PREL 355030...

Page 16: ...t When dis charge has stopped check thermal con trols and replace as necessary Cold water PRV incorrectly fitted Check and refit as required Intermittent water discharge If problem stil persists conta...

Page 17: ...tions Check cylinder ther mostat is switch ing on off with programmer hot water on Is 2 port moto rized valve closing when cylinder reaches tempera ture Check wiring on cylinder thermostat Wiring faul...

Page 18: ...to a roof capable of withstanding high tem perature discharges of water and 3 m from any plastics guttering system that would collect such discharges tundish visible Where a single pipe serves a numbe...

Page 19: ...Regulations 3 Failure to install and commission this appliance to the manufacturer s instructions may invalidate the guarantee The above does not affect your statutory rights For full details on the H...

Page 20: ...F DIFFERENT NAME DATE ADDRESS TEL No REGISTERED OPERATIVE ID CARD No IF APPLICABLE REGISTRATION DETAILS IT IS THE RESPONSIBILITY OF THE INSTALLER TO COMPLETE THIS LOGBOOK AND PASS IT ON TO THE CUSTOME...

Page 21: ...IS THE PRESSURE REDUCING VALVE SETTING IF FITTED WHERE IS OPERATING PRESSURE REDUCING VALVE SITUATED NO YES NO YES NO bar HAS THE EXPANSION VESSEL OR INTERNAL AIR SPACE BEEN CHECKED YES NO WHAT IS THE...

Page 22: ...al and all relevant Codes of Practice and Regulations in force at the time of installation The Product has not been modified in any way tampered with or subjected to misuse and no factory fitted parts...

Page 23: ...ENTS SIGNATURE DATE ENGINEER NAME SERVICE 5 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 7 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 9 COMPANY NAME TEL No...

Page 24: ...Industriveien 1 3300 Hokksund Norway Tel 47 32 25 00 00 oso oso no www osohotwater com This installation manual and all its content is protected by copyright and may be reproduced or distributed only...

Reviews: