16
Eng
Pipe fitting
Vv
Kv
45
ø 15 mm pipe
Cu or PEX
w/approved fittings
1/2” R thread
Nut
Olive
Blandnings/multiventil
-
Off
+
On
A
Temperature adjustment
The water temperature from the water heater to
the taps is adjusted with wheel A.
Start by turning A fully counter-clockwise. Then
adjust to requested temperature according to
the diagramme below by turning A clockwise.
The water inside the unit will, regardless of valve adjustment,
maintain a temperature of approx. 75°C to prevent bacteria.
Vv Kv
360°
Mixing valve:
The Super S 120 and
the SX 150 is fitted
with an UXT valve,
all other volum-
es are fitted
with an UX
valve.
The valve
is factory
fitted, simp-
ly adjust to
required angle
and tighten nut.
SVK
9 bar
Pull out
Overflow
pipe ø18
(not included)
Power cable
3/4”R
Optional
downwards
Optional rearwards
If the safety valve
is to be adjusted
the nut must first
be loosened. Al-
ways remember
to tighten nut
after adjustment.
Overflow
straight
down
(optional)
Power cable and/
or overflow pipe
(optional)
Power cable and/
or overflow pipe
(optional)
Adjustable feet
Bottom view
Spår
Overflow pipe from safety valve
-must be fitted in rooms where a gully is not available
Pipe fitting - mixing valve
Subject to changes without notice
°C
Turns
0
1
2
3
4
5
30
35
40
45
50
55
60
65
70
75
25
clock-
wise
UXT
UX