USER MANUAL FOR THE OSMIO INFINITY HYDROXY GAS/WATER PRODUCTION ELECTROLYSIS SYSTEM
36
8.
Immediately clean up any spilled lye with lots of water
until the ‘slippery’
feeling
is gone
9.
Once fully drained sit upright and refit the black top cap to the top of the system
10.
Store the electrolyte solution (lye) in a suitable marked container (e.g. glass jars
with screw top lids) and store in a safe place
11.
Remove handles and replace screws back on to the system
12.
Remove the Humidifier Bracket and replace screw back on to the system
13.
Use the original packaging for shipping
14.
Enclose a dated and signed Maintenance Log
15.
Indicate any faults on a separate sheet of paper
6.8
Preparing for Storage and Transportation
For short shutdowns (less than one month) you can leave the lye solution in the
system, just make sure all the outputs are sealed. The biggest issue with storage is
lye crystallisation. Crystallisation can plug orifices, make the floating ball stick to the
sight tube, and cause internal shorts. Crystallisation occurs when the water leaves
the system via evaporation so short-term storage is fine as long as all outputs are
sealed.
The system can be transported anywhere by cart or vehicle as long as it is securely
fastened upright and unable to tip over. The system is not designed to operate at an
angle greater than 5 degrees (or to be tipped over).
For longer storage or for shipping, drain and prepare the system (see section 6.6).
Never store the system long term or ship with fluids inside.