With the softener inlet and outlet valves closed - open the Bypass valve - now open
the stop cock.
Installation of Waste/Drain
The flexible drain/waste tubing provided should be connected to the drain/waste
outlet and the tubing should be run to either an “up-stand” or “outside” drain –
there should be a 20mm “air gap” to prevent backflow at the exit of the drain/waste
tube.
The drain/waste tube should be as short as possible and should run upwards to a
maximum of 1 meter. If an extended run of more than 6 meters is required, then it
should be connected to a larger diameter pipe.
Connection of Overflow
The overflow connection is “to the left handside” of the main body of our softener –
run this downwards to an external drain.
Connection of Electric Power
The transformer should be connected to an electrical power supply (continuous)
using the transformer and plug supplied and fitted.
Our softener is pre-programmed, see programming instructions for setting the clock.
Commissioning Our Softener
Add some salt into the “brine” tank, do not allow the salt level to exceed the
overflow level then put/pour 5 -10 litres of water into the brine well and allow this
to soak to create brine for 2-3 hours, then set the clock on our softener.
Press the “Regen” button, this will put our softener into an immediate
Regeneration – this initial regeneration will purge air from the system and confirm
that all cycled are being followed.