
SECTION 3 – MACHINE CONTROLS, INDICATORS AND OPERATION
3-42
– JLG Lift–
3.17 TIE-DOWN/LIFT LUGS
Tie Down
When transporting the machine:
- Platform must be fully lowered in the stowed position.
- Remove all loose items from the machine.
- Machine must be tied down to the truck bed or trailer deck as
shown in Figure 3-20. (8E/20E) or Figure 3-21. (10E/26E)
Figure 3-20. Machine Tie-Down - 8E/20E
To
order go
to
Discount-Equipment.com