SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
6-26
– JLG Lift –
3121159
15.
Electronic Pressure Regulator (LP only)
Interval - 3 Months or 150 hours of operation
Comments - Drain oil build up. Refer to Section 6.5,
DRAINING OIL BUILD UP FROM THE PROPANE REGU-
LATOR (Prior to S/N 0300134626)
16.
Fuel Filter (Propane) - GM Engine
Interval - 3 Months or 150 hours of operation
Comments - Replace filter. Refer to Section 6.6, Propane
Fuel Filter Replacement
To
order
go
to
Discount-Equipment.com