SECTION 6 - ACCESSORIES
6-8
– JLG Lift –
3121606
Preparation and Inspection
• Check for cracked welds and damage to tray.
• Ensure tray is properly secured to platform.
• Ensure strap is not torn or frayed.
Operation
1.
Load SkyGlazier™ tray with panel.
2.
Route the adjustable strap around the panel and tighten
until secure.
3.
Position the panel to its intended location.
6.4
SKYPOWER
™
The SkyPower
™
system supplies AC power to the platform
through an AC receptacle to run tools, lights, cutting, and weld-
ing equipment.
To
order go
to
Discount-Equipment.com