IG-175-EN version 02; 17/06/2016
10
Applications
General Instructions
ekor.gid
2.5. Communications
The ekor.gid Smart Distribution Management Unit provides
the Substation with the possibility of integrating different
means for establishing communication with the Customer
Management Centre or the dispatching Centre:
1. GPRS
2. PLC-Medium Voltage
3. Optical Fibre
4. Radio
Isolated communication of the Low Voltage network is
possible thanks to the operating time provided by the
batteries integrated in the ekor.gid unit, which provide
power to these components in the absence of voltage.
The option is available for adding a PLC-Medium Voltage
router for grouping several Transformer Substations, etc.
Summary of Contents for velatia ekor.gid
Page 31: ......