![Ormandy Optimajor GLP S 3.0 Technical And Maintenance Instructions Download Page 7](http://html1.mh-extra.com/html/ormandy/optimajor-glp-s-3-0/optimajor-glp-s-3-0_technical-and-maintenance-instructions_1653912007.webp)
Page
7 / 19
3.5. Coupling of the boiler to the chimney
IMPORTANT : The coupling of the boiler to the chimney must be made taking into
account the overall dimensions of the jacket.
-
Provide a coupling duct with a diameter of 200 mm. Height of the axis of the duct : 670 mm (not including the base).
-
Place the chimney coupling duct
-
Ensure the airtightness of the coupling to the chimney
3.6. Assembling of the boiler casing
C
a
u
ti
o
n
*
:a
ss
em
b
le
d
b
y
th
e
sh
ee
t-
m
et
al
w
o
rk
er